|
Coffee Shop Talk of a non sexual Nature Visit Sam's Alfresco Heaven. Singapore's best Alfresco Coffee Experience! If you're up to your ears with all this Sex Talk and would like to take a break from it all to discuss other interesting aspects of life in Singapore, pop over and join in the fun. |
|
Thread Tools |
#1
|
|||
|
|||
Serious SMRT Gives Up On Fucked-Up LRT System! Considering Scrapping! Guess The Line!
An honorable member of the Coffee Shop Has Just Posted the Following:
SINGAPORE - Rail operator SMRT Corp and regulator Land Transport Authority (LTA) are deciding what to do with the problematic Bukit Panjang LRT, including scrapping the system altogether. In a company blog, SMRT Trains managing director Lee Ling Wee said a joint team is reviewing the future of the system with a view to giving it a major overhaul. "It will be more than just a makeover," Mr Lee wrote, adding that the 17-year-old system is near "the end of its design life". He said there are three options on the table. One, to deploy self-powered autonomous guided vehicle on the existing viaduct. Two, build a new LRT system with significant design enhancements in key infrastructures such as power supply, signalling, rolling stock, tracks and stations. Three, to renew the existing Bombardier system with a more updated signalling system - allowing trains to be tracked more accurately, and to ply at a higher frequency. Mr Lee said that an idea to do away with the entire LRT system was also mooted and for residents in the Bukit Panjang area to go back to riding buses. "This is not far-fetched, as a fully loaded high-capacity bus like a double-decker can take 130 passengers, which is more than the 105-person capacity of a single Bombardier train," he said. He said this option would of course lead to more road congestion. As the joint team decides on the long-term solution to fix the problem-prone system, SMRT is putting in place short-term measures to address its reliability issues. These include replacing its rail brackets, load-testing trains to reduce power faults, adjust motor controller settings, and install cameras on the undercarriage of four train cars to monitor interface between trains and rail. The Bukit Panjang LRT line has been beset with problems since it began operating in 1999, most recently last week when train services were suspended between interchange stations for almost five hours, causing inconvenience for thousands of commuters. http://www.businesstimes.com.sg/tran...-internal-blog Click here to view the whole thread at www.sammyboy.com. |
Advert Space Available |
Bookmarks |
|
|
t Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
sinkie woman and friend catch vd from guy they fucked from chat line | Sammyboy RSS Feed | Coffee Shop Talk of a non sexual Nature | 0 | 04-12-2015 06:00 PM |
sinkie woman and friend catch vd from guy they fucked from chat line | Sammyboy RSS Feed | Coffee Shop Talk of a non sexual Nature | 0 | 04-12-2015 05:00 PM |
sinkie woman and friend catch vd from guy they fucked from chat line | Sammyboy RSS Feed | Coffee Shop Talk of a non sexual Nature | 0 | 04-12-2015 04:40 PM |
Who kenna late this morning SMRT NS Line Fucked Up AGAIN | Sammyboy RSS Feed | Coffee Shop Talk of a non sexual Nature | 0 | 23-07-2014 01:50 PM |
Who kenna late this morning SMRT NS Line Fucked Up AGAIN | Sammyboy RSS Feed | Coffee Shop Talk of a non sexual Nature | 0 | 23-07-2014 01:00 PM |